Reliable Power Supply - Used Energy Equipment from Renowned Manufacturers
We specialize in the supply of used electrical equipment: power generators 10-3000 kVA, power transformers 100-40000 kVA, medium/low voltage switchgear, UPS systems, cogeneration units. We collaborate with brands such as Caterpillar, Cummins, ABB, Siemens, Schneider Electric. Each device undergoes a 195-point inspection including insulation tests, winding resistance measurements, load tests, transformer oil analysis, and thermal imaging of connections. Savings when purchasing used equipment amount to 40-60% while maintaining efficiency >95% and a lifespan of 15-25 years.
Key Parameters Verified Before Sale
We perform insulation resistance measurements (>100 MΩ at 5kV DC), dielectric strength tests (2×Un+1kV for 60s), winding resistance measurements (deviation <2% from factory), DGA analysis of transformer oil (dissolved gases
Advanced FAQ - Diagnostics and Operation of Energy Equipment
How to Conduct Comprehensive Diagnostics of a 1600 kVA Oil Transformer 15/0.4 kV Before Purchase?
External inspection and documentation: Tank condition: no penetrating corrosion, flexible seals. Insulators: no cracks, signs of surface discharges. Conservator: oil level 50-75%, breather operation. Radiators: unobstructed, no leaks, valves open. Nameplate: compliance of parameters with documentation. Buchholz: operation test, no gas in the relay. Thermometers: consistent readings, alarm contacts functional. Basic electrical measurements: Insulation resistance (megger 5kV DC): GN>1000 MΩ, DN>800 MΩ, GD>1500 MΩ @ 20°C. Absorption coefficient R60/R15: >1.3 (good condition). Polarization coefficient R600/R60: >1.5-2.0. Winding resistance: GN side: RAB, RBC, RCA difference <2%. DN side: Rab, Rbc, Rca difference <2%. Comparison with factory data: deviation <5%. Temperature corrected to 75°C for comparison. Transformation ratio and connection group: Measurement of transformation ratio: each tap switch position. Tolerance: ±0.5% from nameplate value. Connection group: verification of Dyn11 or other using a phase meter. Phase shift: compliant with group ±1°. Dielectric strength test: Test voltage GN: 38 kV AC/60s (for 15kV). Test voltage DN: 3 kV AC/60s (for 0.4kV). Between phases and to ground: no breakdowns or jumps. Leakage current: <50 μA, stable during the test. Transformer oil analysis (DGA): Hydrogen H2: <150 ppm (thermal/electrical breakdown). Methane CH4: <120 ppm (local overheating). Ethane C2H6: <65 ppm (oil overheating). Ethylene C2H4: <50 ppm (overheating >500°C). Acetylene C2H2: <5 ppm (arc discharges!). CO: <500 ppm, CO2: <5000 ppm (cellulose degradation). Physicochemical parameters of oil: Breakdown voltage: >60 kV/2.5mm (IEC 60156). Water content: <20 ppm for transformer in operation. Loss factor tgδ: <0.5% @ 90°C. Acidity: <0.1 mgKOH/g (fresh <0.03). Interphase voltage: >40 mN/m (new >45). Partial discharge (PD) measurement: PD level: <10 pC at 1.1×Un (good condition). PRPD pattern: no concentration in specific phases. Location: acoustic/electrical source of PD. Trend: stable during a 30-minute test. Additional measurements: Short-circuit impedance: 4-6% typical for 1600 kVA. No-load current: <2% of rated current. Losses: no-load <2.5 kW, load <17 kW @ 75°C. Tap switch test: fluidity, resistance <500 μΩ. Thermal imaging: Connections: ΔT<30°C at 80% load. Insulators: uniform temperature, no hot spots. Radiators: temperature gradient consistent with circulation. Bushings: no overheating at sealing points. Load test (if possible): 100% load for 4h: stability of temperatures. Noise: <65 dBA at 1m distance. Vibration: <100 μm on the tank at 50 Hz. Voltage regulation: ±5% range, smooth operation. Technical condition assessment: Very good condition: possible operation for 15-20 years. Good condition: 10-15 years with periodic maintenance. Satisfactory condition: 5-10 years, requires oil regeneration. Poor condition: major repair or replacement necessary. Required documentation: Factory protocols: FAT, nameplate data. Operating history: loads, failures, repairs. Recent tests: max 2 years, parameter trends. Certificates: compliance with standards, UDT approvals.
The wesellmachines.com page uses cookies to adjust the content and operation of the website to the individual needs of the Users. You can change the rules for storing cookies at any time in your web browser settings. By using the website, you consent to the provisions of Privacy policy and Regulations